Radpol S.A. supplier of pre-insulated pipes for ecological investment in Warsaw
Thanks to the funds obtained by the Investor from the Operational Programme “Infrastructure and Environment 2014 – 2020” it was possible to rebuild the district heating network in Warsaw’s Praga district.
As part of the task, Radpol delivered over 3 km of modern pre-insulated pipes and all elements necessary for laying the pre-insulated heating pipeline.
The aim of the investment was to reduce the emission of local economy through effective distribution of system heat.
More information on our blog: