Radpol’s pipe systems at the Warsaw Subway construction
Country
Poland
Completion of the project
Deliveries of pre-insulated products for the investment – June-September 2019
Place of application
Warsaw – second subway line – construction of underground heating network
Product
Preinsulated pipes, fittings, fittings and joint assemblies of RADPOL S.A.
Description of the investment
The construction of the second Warsaw subwey line is a key infrastructural investment in the Warsaw. Radpol S.A. supplied pre-insulated pipes, fittings, fittings and joint assemblies for the flagship investment in Warsaw, which is the construction of the second line of the underground.
The entire line will be complet by 2022 and will run from Bemowo to Targówek and Bródno. It will have 21 stations.
Radpol S.A. supplied the investment with components for the construction of an underground pre-insulated heating network with diameters ranging from DN 40 to DN 800. The largest part of the investment is DN 800 – 1.5 km of pipes on the key section C21 – Targówek.